Projects

Travelodge Conversion – Wolverhampton

Converting a 1960's office block to a 99 bedroom Travelodge with a 60 cover bar café. The project is on the main ring road and was logistically challenging when installing the…

Challenges

Converting a 1960's office block to a 99 bedroom Travelodge with a 60 cover bar café. The project is on the main ring road and was logistically challenging when installing the bathroom pods.

The project involved a significant strip out as part of this 38week project. During these activities the fire protection and prevention measures had to be maintained. Due to its location the site attracted significant interest from the local authority and statutory bodies including the HSE.

Solution

Safety Advisors were involved in the fire planning as part of their CDM co-ordination role and proposed the final fire strategy for the building. On-going involvement in the form of site inspections ensured any GAPS were identified and resolved quickly ensuring the site protected those directly involved in the project and the public etc.

Results

Compliance with the insurance industry fire prevention requirements. No RIDDOR reportable incidents.

Skills

Fire requirements of the HSE and Insurers

Regulatory Reform (Fire Safety) Order 2005

Construction Health and Safety

Communication between all stakeholders

Tell us what you are dealing with.

Call the team or send a note. A consultant will come back to you.