The rail freight terminal operators and Network Rail both had high standards for the provision of health and safety on the site. The works involved a cut and fill operation of a…
Challenges
The rail freight terminal operators and Network Rail both had high standards for the provision of health and safety on the site. The works involved a cut and fill operation of approx. 230,000m3 and ground stabilisation. This involved significant plant operations and haulage operations.
Solution
A detailed transport plan was developed. Planned rail outage and liaison with Network Rail. A significant training programme introduced to maintain operatives health and safety knowledge. Establishment of On-Site training facility. Supervisors empowered to co-ordinate their works.
Results
Training undertaken on site. Reduced downtown during training. No RIDDOR reportable accidents.
Skills
Site based health and surveillance monitoring by Safety Advisors
Training provided by Safety Advisors
Staff involved in the planning of the transport routes
Supervisors involved in risk assessments